6. The import

Before you start

The cluster settings changed and the pre-vmca-import snapshot taken (stage 5). /root/vmca/vmca-fullchain.pem and /root/vmca/vmca.key on the VCSA (3.2, 4.5). The service census from 1.2, the SSO administrator password, and the rollback plan from 1.4.

vCenter goes down in this stage

This is the disruptive step. From the final Y onward, certificate-manager replaces the VMCA root, regenerates every certificate vCenter issued, and restarts every service.

6.1 Before you start​

Use an SSH session that will not drop

Run it from an SSH session that will not drop. sshd is not restarted, but if your client disconnects mid-run the process can be killed. The VM console in the vSphere Client is a fallback, but it becomes unavailable as soon as vCenter's services stop, so the ESXi Host Client console is the better fallback.

  • Have ready: the SSO administrator password, /root/vmca/vmca-fullchain.pem, /root/vmca/vmca.key, and the answers in the table in 6.2.
  • Keep a second terminal open on the workstation for watching port 443.

6.2 Prompt-and-answer transcript​

Start it on the VCSA Bash shell:

/usr/lib/vmware-vmca/bin/certificate-manager

Main menu. The menu box wording may vary by build; the option you need is the one labelled Replace VMCA Root certificate with Custom Signing Certificate and replace all Certificates:

_________________________________________________________________________________________
| |
| *** Welcome to the vSphere 8.0 Certificate Manager *** |
| |
| -- Select Operation -- |
| |
| 1. Replace Machine SSL certificate with Custom Certificate |
| |
| 2. Replace VMCA Root certificate with Custom Signing |
| Certificate and replace all Certificates |
| |
| 3. Replace Machine SSL certificate with VMCA Certificate |
| |
| 4. Regenerate a new VMCA Root Certificate and |
| replace all certificates |
| |
| 5. Replace Solution user certificates with |
| Custom Certificate |
| |
| 6. Replace Solution user certificates with VMCA certificates |
| |
| 7. Revert last performed operation by re-publishing old |
| certificates |
| |
| 8. Reset all Certificates |
|_________________________________________________________________________________________|
Note : Use Ctrl-D to exit.
Option[1 to 8]: 2

Answer: 2.

Use a configuration file:

Do you wish to generate all certificates using configuration file : Option[Y/N] ? : Y

Answer: Y. certificate-manager then asks for the certool values below and uses them for every certificate it regenerates.

SSO credentials:

Please provide valid SSO and VC privileged user credential to perform certificate operations.
Enter password:

Answer: [email protected], then its password (not echoed).

certool values. Each prompt shows a default in brackets that varies by build. Type the value from the table and press Enter. The exact bracketed text after each field name may differ on your build; the field names are fixed.

Please configure certool.cfg with proper values before proceeding to next step.

Press Enter key to skip optional parameters or use Default value.

Enter proper value for 'Country' [Default value : US] : US
Enter proper value for 'Name' [Default value : CA] : Example vSphere CA
Enter proper value for 'Organization' [Default value : VMware] : Example Organization
Enter proper value for 'OrgUnit' [Default value : VMware Engineering] : IT Infrastructure
Enter proper value for 'State' [Default value : California] : Example State
Enter proper value for 'Locality' [Default value : Palo Alto] : Example City
Enter proper value for 'IPAddress' (Provide comma separated values for multiple IP addresses) [optional] : 192.0.2.10
Enter proper value for 'Email' [Default value : [email protected]] : [email protected]
Enter proper value for 'Hostname' (Provide comma separated values for multiple Hostname entries) [Enter valid Fully Qualified Domain Name(FQDN), For Example : example.domain.com] : vcenter.example.org
Enter proper value for VMCA 'Name' : Example vSphere CA
Prompt fieldAnswerWhat it becomes
CountryUSC= on regenerated certificates
NameExample vSphere CACN= in the certool config
OrganizationExample OrganizationO=
OrgUnitIT InfrastructureOU=
StateExample StateST=
LocalityExample CityL=
IPAddress192.0.2.10an IP SAN on the machine SSL certificate
Email[email protected]an email SAN on the machine SSL certificate
Hostnamevcenter.example.orgthe DNS SAN on the machine SSL certificate. Must equal the PNID from 3.1.
VMCA NameExample vSphere CAthe name VMCA uses for itself; keep it equal to the CA certificate's CN
The Hostname field decides whether browsers trust vCenter

Browsers match only on the SAN dNSName and ignore the CN. If Hostname is wrong or empty, the chain can be perfect and clients still get a name-mismatch error. Enter the PNID. Add further names (comma-separated) only if they already resolve in DNS. The machine SSL certificate may carry several names; the VMCA CA certificate may not, and it does not get them from here.

Import, not generate:

1. Generate Certificate Signing Request(s) and Key(s) for VMCA Root Signing certificate

2. Import custom certificate(s) and key(s) to replace existing VMCA Root Signing certificate

Option [1 or 2]: 2

Answer: 2.

The chain and the key:

Please provide valid custom certificate for Root.
File : /root/vmca/vmca-fullchain.pem

Please provide valid custom key for Root.
File : /root/vmca/vmca.key

Answers: /root/vmca/vmca-fullchain.pem (the full chain from stage 4, not the VMCA certificate alone), then /root/vmca/vmca.key.

Final confirmation.

Point of no return

This is the point of no return (short of a revert).

You are going to replace Root Certificate with custom certificate and regenerate all other certificates
Continue operation : Option[Y/N] ? : Y

Answer: Y.

6.3 Expected progress output​

Expected output

The status line updates in place. Captured as a transcript it reads:

Status : 0% Completed [Replacing Root Cert...]
Status : 35% Completed [Replaced Root Cert...]
Status : 35% Completed [Replacing Machine SSL Cert...]
Status : 45% Completed [Replace machine Cert...]
Status : 50% Completed [Replace vsphere-webclient Cert...]
Status : 55% Completed [Replace vpxd Cert...]
Status : 60% Completed [Replace vpxd-extension Cert...]

Updating new vpxd-extension certificate for VC extended solutions

Updating the certificate for VC extension com.vmware.vim.eam

Updating the certificate for VC extension com.vmware.rbd

Updating the certificate for VC extension com.vmware.imagebuilder
Status : 65% Completed [Replace hvc Cert...]
Status : 70% Completed [Replace wcp Cert...]
Status : 70% Completed [stopping services...]
Status : 85% Completed [starting services...]
Status : 100% Completed [All tasks completed successfully]

The list of VC extension lines depends on which solutions are registered with your vCenter.

In the tested run, the Y was entered at 18:17:35 UTC and 100% Completed [All tasks completed successfully] appeared at 18:21:05 UTC: about 3.5 minutes. The exit status was 0.

Import rejected

If you see this instead, the chain or key was rejected:

Status : 0% Completed [Operation failed, performing automatic rollback]

The tool restores the original certificates itself. Read /var/log/vmware/vmcad/certificate-manager.log, fix the cause (see stage 11), and start again from stage 6. The usual cause is an ECDSA signature somewhere in the chain, a chain in the wrong order, or a certificate that does not match the key.

6.4 What the outage looks like​

  • From about 70% (stopping services...) until shortly after 100%, vCenter is unavailable: about 2.5 minutes in the tested run.
  • The vSphere Client shows errors or a blank page, then logs every user out. Log in again once /ui loads.
  • govc calls fail with connection errors, then work again (with GOVC_INSECURE=1).
  • Port 443 briefly refuses connections, then presents the new certificate chain.
  • If you exit the Bash shell back to the appliance shell while services are starting, you may see [ERROR]: Failed to connect to service. That is the appliance shell losing its API connection during the restart. It is harmless.
  • Virtual machines keep running. ESXi hosts keep running their workloads.

Watch from the workstation:

while ! curl -sk -o /dev/null -w '%{http_code}\n' https://vcenter.example.org/ui/ | grep -q 200; do sleep 5; done; date -u

Verify before continuing​

On the VCSA:

service-control --status --all

The Running list must match the census from 1.2 exactly. If a service that was running is now stopped, start it with service-control --start <name> and look at its log before going further.

On the workstation:

openssl s_client -connect vcenter.example.org:443 -servername vcenter.example.org -showcerts </dev/null 2>/dev/null \
| grep -E '^ *[0-9] s:|^ *i:'
govc about | head -1
Expected output
0 s:CN = vcenter.example.org, ...
i:CN = Example vSphere CA, C = US, ST = Example State, L = Example City, O = Example Organization, OU = IT Infrastructure
1 s:CN = Example vSphere CA, ...
i:CN = Example Intermediate CA G1, ...
2 s:CN = Example Intermediate CA G1, ...
i:CN = Example Root CA G1, ...
FullName: VMware vCenter Server 8.0.3 build-...
  • certificate-manager reached 100% Completed [All tasks completed successfully].
  • The same services are running as before.
  • Port 443 presents three certificates: machine SSL, VMCA, Intermediate.
  • The vSphere Client loads and you can log in. govc about works.